Month: February 2011

Polar Bear Progress Report

It’s been over 9 months since I last blogged about Polar Bear’s status. A lot can happen in 9 months. I’ve invested a fair amount of blood, sweat, and tears. I laid down new flooring. Currently I have bed liner coating against the metal, a foam later next, wood on top of the foam, and… Read more »